• Teambausteine
  • Teambausteine
  • Floßbau in Osnabrück
  • Floßbau in Münster
  • Flossbau im Beverland
  • Floßbau im Münsterland
  • Floßbau auf der Ems
  • Flossbau

Raft building

When building a raft is to implement a viable solution for the team with the existing simple means and its own design drawing. Subsequently the raft is checked on water on his "suitability". Team spirit, ingenuity, and a shared experience is the main focus here.

Duration

  • ca. 2 till 3 hours

Services

  • equipment
  • master of ceremonies

Optional Services

  • incl. drinks (lemonade, mineral water, apple spritzer)